Create bends or chamfers

Creates bends or chamfers at the intersection of two lines in a selectable area

Button:

Command name: CreateBends

  1. Specify the lower left corner of the area boundary.
  2. Specify the top right-hand corner of the area boundary.
The marked pipes are replaced by a bend element at the intersection of two pipes in the DHW and heating trades.

The marked pipes are bevelled at 45° at the intersection of two pipes in the waste water system.

Note:
For the CreateBends command to be executed successfully, the pipes must not be continued at the intersection.
Note:
When recording the pipe network, the structural design is taken into account when determining the deflection.