Jump to main content
Legal notices
Copyright © Dendrit GmbH. All rights reserved.
Furnishings
Project management
After starting STUDIO, select what you want to do in the project management.
Drawing initialisation
When a new drawing is opened, various settings must be made at the start.
User interface
The customisable user interface of STUDIO consists of various elements, which are explained in more detail below.
Structure of the user interface
Building services toolbar
The building services toolbar is the dynamic command centre of STUDIO.
Menu
Toolbar
The toolbar is located at the top of the screen directly below the menu bar.
Status bar
The status bar shows the current status of STUDIO.
KTS design module
The KTS design module enables you to dimension the KTS thermal system, a centralised DHW heating system based on the flow-through principle. It only takes three steps to achieve the result, including documentation of the results.
Determining requirements
In the first step, demand determination, you define the specific demand for your planning using demand profiles or by specifying manual tapping processes.
Interim result
In the second step, ‘Interim result’, a combination of results is determined on the basis of the requirements profiles and the calculation parameters.
Result
The third and final step, Results, provides you with comprehensive results documentation.
Support
If you need help, please contact our support team.