12 Counted stub line installation
The configuration 12 Counted branch line installation in the Room-based drawing window, which is integrated on delivery, generates floor lines and connects the consumers with individual supply lines. Water meters with a concealed shut-off device are generated. The consumers are connected with a branch line.

