Main ventilation

The following example shows the drawing of the main ventilation.

  1. Connect the ventilation pipe (1) on the top floor to the waste water pipe (2).

  2. In the component library, expand the Ventilation end point/ventilation valve group with the right mouse button and select the ventilation end point.
  3. Place the ventilation end point at the end of the ventilation duct.
    Note:
    The layer connection is created automatically during detection.