Water Abstraction Strategy – Commissioning in accordance with DIN EN 806-4
The water withdrawal strategy Commissioning 806-4 of the water withdrawal simulation is carried out as follows:
- Opening all taps
- All extraction points are opened room by room.
- They are sorted according to the length of the flow path, starting with the shortest flow path.
- Tap points without taking flow limiters into account
Note:
The termination criterion is a 20-fold water exchange in all sections where water is in motion.