Initial components on the PWC layer

By definition, the drinking water installation begins at the water supply company's (WVU) pipe with the house connection point component. The section in which this component is located is the service pipe.

Component group: Special symbols

Component: House connection point

Pipe network structures within a drinking water installation, e.g. a floor installation, which are to be displayed and calculated separately, begin with the start or transfer point.

Component group: Special symbols

Component: Starting or transfer point